The small road base plant that was utilized to assist with increased City of Calgary demand has completed its duties and has been shipped out of the STAR site.
An Alberta Transportation Contractor has completed their 2025 requirements and has wrapped up operations within the STAR site. Equipment has started to mobilize off-site for the winter.
The BLV Group is scheduled to conduct a small routine blasting operation on the Eastern side of the pit on Thursday, December 18th between Noon and 5pm. Blasting is a safe permitted activity and will
The BLV Group is scheduled to conduct a small routine blasting operation on the Eastern side of the pit on Monday, December 15th between Noon and 5pm. Blasting is a safe permitted activity and will on