top of page
Search
  • Stoney Trail Pit

Return to full production & 7 ha seeded

After a long winter the STAR Pit is returning to full production with 5 different plants working onsite. The water truck and sweeper are active and all crushers are utilizing their dust suppression systems. 7 hectares of slopes were recently reclaimed and seeded to native grass.

16 views0 comments

Recent Posts

See All

The BLV Group is scheduled to conduct a small routine blasting operation on the western side of the pit tomorrow (Saturday September 23rd) between 10am and 3pm. Blasting is a safe permitted activity a

The BLV Group is scheduled to conduct a small routine blasting operation on the eastern side of the pit tomorrow (Thursday September 21st) between Noon and 5pm. Blasting is a safe permitted activity a

The BLV Group is scheduled to conduct a small routine blasting operation on the western side of the pit tomorrow (Wednesday July 19th) between Noon and 5pm. Blasting is a safe permitted activity and

bottom of page