We will be starting earthmoving activity this week in Ph 3 East located adjacent to 85 Street utilizing scrapers and dozers. The activity will remove overburden to expose the gravel deposit and place the soil in the pit bottom where the gravel has been excavated. This project should last approximately one month and be conducted during daylight hours

16 views0 comments

Recent Posts

See All

The BLV Group is scheduled to conduct a small routine blasting operation on the western side of the pit tomorrow (Monday April 17th) between Noon and 5pm Blasting is a safe permitted activity and will

The BLV Group is scheduled to conduct a small routine blasting operation on the western side of the pit tomorrow (Thursday Mar 30th) between Noon and 5pm Blasting is a safe permitted activity and will

The BLV Group is scheduled to conduct a small routine blasting operation on the western side of the pit tomorrow (Friday Dec 30th) between Noon and 5pm Blasting is a safe permitted activity and will o